Saturday, July 18, 2015

Rear Window Drilled & Edges Smoothed

Although getting an extremely late start today decided to take advantage of the very  hot hangar and enlarge the holes in the rear window. The DOG Aviation procurement department found Plexiglass drill bits at Avery Tools and decided to purchase a whole set. Plexiglass drill bits are recommended for drilling into the Plexiglass and polycarbonates such as the aft window. The drill bits are very pointed and designed so the cutting edges of the drill bits don’t catch the material (thus not causing cracks) when passing through the back edge of the piece being drilled.

Kit of six Plexiglass drill bits from Avery Tools.

Van’s plans call for using a #27 drill bit and although the kit has one, will be using the slightly larger 5/32" Plexiglass bit. This will allow for a slight bit of wiggle room and also provides room for the window to expand and contract without placing excess stress on the holes. In fact, Van’s support staff has suggested doing this to other builders. So a thin piece of plywood was placed under the window, then the window was clamped onto the plywood and the holes on either side of the clamp were drilled using the 5/32" Plexiglass bit. The idea here was to keep downward pressure on the window while it was being drilled so the back edge of the hole was being supported as best as possible.
The difference between the 5/32" Plexiglass bit on the top and a regular 5/32" drill bit on the bottom can easily be seen in this photo.
Drilling the screw holes in the RV-12’s aft window using a 5/32" Plexiglass bit.

The aft window had some rough edges on it so used a sanding block to smooth up the edges. Did not totally finish the window because I need some finer grit sandpaper. Plan on going up to 1000 grit so the edges of the window will take on a polished look and this will also mitigate the possibility to stress cracks as well.
Rough edges on the aft window can be seen here.
Smoothing the edge of the aft window with a sanding block.

At some point in the future, the plan is to very lightly countersink the edges of all the holes in the aft window using a countersink cage and finish off polishing the edges.

Wednesday, July 15, 2015

The Eagle Grows Legs

Although not officially “on the gear” the eagle slowly grew legs as the work day progressed. The left gear leg was installed first and working alone made this a much tougher chore than it needed to be because of the need to traverse back and forth between under the belly and working from up above. The main gear uses three sizes of bolts AN4, AN5, and AN6, so a host of sockets and wrenches are required to install the hardware. At one point I had wrenches sitting on blocks of wood to keep them on the bolts while tightening nuts from below. Installing the gear is a task much easier accomplished with the aid of a helper.
When working by yourself, placing blocks of wood under the wrenches helps keep them in position while tightening the nuts from below. Also note how temporarily removing the Adel clamp for the wire conduit gives easy access to the nut in the top left of the photo.
Nope … not sleeping on the job. Installing the U-1203 the gear attach brackets for the left  U-1220 gear leg after placing grease on the mating surfaces per the instructions.

Mike came by just as I was about to begin torquing the hardware for the left gear leg and he was quickly put to work placing wrenches on the nuts and bolts from up above while I torqued the gear hardware from below.
Mike lending assistance by holding wrenches on the landing gear hardware from up above.

One thing we did to allow for better access to the landing gear bolts was to temporarily remove the Adel clamp holding the wire conduit in the center channel. Builders may want to consider not tightening the outer most Adel clamps on each side of the center channel wire conduit until after tightening the landing gear bolts. Work is so much easier when one can see what they are working on.

To gain access to the hole in the bottom skin to install the hardware for the right landing gear, Mike assisted in moving the workbench so it was canted at an angle yet still supported the center channel area. This allowed enough clearance for a hand to get into the access hole in the bottom skin so the gear mounting hardware for the right U-1220 gear leg could be installed.

Mike temporarily removing the outermost Adel clamp on the right side to allow for easier access to the landing gear hardware.
Installing the hardware for mounting the U-1220-R landing gear leg.

Return from the future: As can be seen in the previous photos, the gear legs are not primed. During the mega priming session in the fall the landing gear legs were missed because they were in the bottom of the shipping crate covered with cardboard. This is one of the only parts Van's plans instructs the builder to make sure you prime .... sadly I did not and installed them anyway. I'm now at my first condition inspection and seeing corrosion on the gear legs so felt compelled to remove the gear legs for a soak in Alumiprep 33 to remove the surface corrosion prior to priming. So my tip to fellow builders is make sure the gear legs are primed ... because they sure will corrode fast if not coated.


With both the left and right U-1220 landing gear legs now attached, decided to keep rolling along and install the WD-1201 “shin whacker” nose gear assembly.  (Have not walked into it yet … but we all know, it’s only a matter of time).  The nose gear assembly is installed onto the bottom of the fuselage with thirteen AN3-4 bolts. Later, just prior to the engine instillation, the two mounting holes on the upper portion of the nose gear assembly that touches the lower firewall will be match drilled into the firewall and the holes enlarged.
Mike and I installing the thirteen AN3-4 bolts that secure the WD-1201 nose gear assembly onto the belly of the fuselage.
Final torquing the mounting bolts for the WD-1201 nose gear assembly.
All three of the DOG Aviation’s RV-12 gear legs installed and ready for instillation of the wheels … thanks for all the assistance Mike.


Canopy Frame Installed On The RV-12

Work continued on the canopy frame and prior to being installed onto the fuselage, the C-1215 latch handle stop needs to be riveted onto the canopy frame. Measurements are given for its location on the canopy frame … instead of marking the already painted canopy frame, some masking tape was used to create the vertical edge alignment for the stop along with a line drawn onto the tape for to determine positioning above the bottom edge of the canopy frame. Positioning measurements for the C-1215 stop are taken from the centerline of one of the machining holes in the canopy frame.
C-1215 latch handle stop in position, clamped and ready for drilling rivet holes into the canopy frame.
Match drilling the C-1215 latch handle stop into the WD-1219 canopy frame with a #30 drill bit.
 
Once match drilled to the canopy frame, the C-1215 latch handle stop was removed for deburring then riveted in place with LP4-3 pop rivets. At this point the WD-1219 canopy frame is ready to be installed onto the fuselage. Bushings are installed into the forward holes on either side of the canopy frame … these will provide the main pivot point for the canopy frame. After bolting the canopy frame onto the fuselage, the rod end of the C-1216 gas struts receive a spacer bushing and are bolted onto the fuselage.

Placing the WD-1219 canopy frame in position on the fuselage to be secured with AN4-6A bolts.
Tightening the AN4-12A mounting bolt for the right C-1216 gas strut.

At this point, Mike came over to give me a hand in installing the landing gear legs … but I was running behind schedule a little and had not had time to round up all the parts necessary. Mike assisted in removing the canopy from the crate so the gear legs and tires residing beneath it could be retrieved. Rather than hold Mike up, we decided if the work bench under the fuselage was canted at an angle I would be able to begin installing the left landing gear hardware by myself and Mike could come back the next afternoon so the same could be done for the right side.

Began the instillation of the U-1202 C&D outboard doubler and wear plate on the left side and was just barely able to get the pieces tightened by myself. Now that the turtle deck skins are installed, trying to hold tools on hardware inside the center channel while reaching inside the cockpit to tighten the nuts was difficult to do by myself. Fortunately, I’m tall enough and have a fair amount of reach, so was just barely able to get the job done. My suggestion for builders doing the build by themselves is to leave the turtle deck skins  off until you have mounted the gear legs … it will be much easier to reach inside the cockpit to tighten the nuts. Also of note: The doubler plates are installed with large #3 Philips screws, only one of which can be turned with a screwdriver. To access the inboard screw, it requires a 90 degree Philips screwdriver or a #3 Philips bit on a ratchet (which is what was used).
This tool outfitted with a #3 Philips bit allowed access to the inboard Philips screw in the U-1202D wear plates.

Unfortunately, no photos were taken of the gear work because of a huge upsetting distraction. While assembling the hardware for the gear leg instillation it appeared as though I was missing two of the four AN4-24A bolts. I had not remembered installing any of these bolts to this point, so checked the inventory sheets … yep, received four. Where could the other two bolts have gone?  Spent the next couple of hours combing through all the parts in the hangar … several times. I was at a loss because ALL the hardware was placed into parts bins during the inventory. Next, the plans were reviewed page by page to verify the two bolts were not used incorrectly at a wrong location. Nope, the only bolts nearly that long had holes drilled into them. I was at a total loss … so finished torquing the wear plates and called it a night.

While closing the hangar door it came to me … many months ago when the parking brake was added, I could not use the measurements given in the plans for the brake lines to the fittings on the U-1203 gear attach bracket … so the two bolts were temporally used to hold the bracket in position for the measurements. Sure enough, the two bolts were in the holes on the right side. I felt both quite relieved and also very foolish for having not removed the bolts after the brake line was measured.

Monday, July 13, 2015

Doing Odd & Ends While Watching Primer Dry

Yesterday, after remaking the F-1258 links for the right rudder cable, tried to prime the parts that have been prepared the past couple of days … but the weather was not cooperative as it rained most of the afternoon and evening so worked on little things.  However, that all changed this afternoon and was able to get all the parts awaiting primer sprayed.

Following the cleanup of the airbrush, decided to have a look at the hardware that will be attaching the rear window to the turtle deck. The holes in the turtle deck looked a little small to me for the #6 screws called for in the plans, so an attempt was made to place one of the screws into the holes in the turtle deck … it wouldn’t fit. The plans were referenced and nowhere on the plans I have does it mention enlarging the turtle deck holes to #27. The plans just say to remove the aft window and enlarge all the holes in the window with a #27 Plexiglas bit … but make no mention of also needing to drill out the holes in the turtle deck skins to #27 for the 6-32 screws that will secure the aft window to the turtle deck skins.

Beginning on the quick task of drilling out all the holes in the turtle deck to #27 so the 6-32 screws will fit through the holes in the turtle deck skins to secure the aft window.

Builder tip: Prior to doing the final instillation of the aft window onto the turtle deck skins, builders should check that the #6 mounting screws fit through the holes in their turtle deck skins. Better to find out now as opposed to finding out after the batch of fuel tank sealant used to seal the window has been mixed.

Looking for more to do instead of watching the primer dry, decided to have a look at the canopy parts. Some items were already taken care of prior to painting the canopy frame. However, there were a couple of tasks that still remained to be completed. One such task involves enlarging the mounting holes in the C-1216 gas struts.
Both C-1216 gas struts prior to drilling. The plans show the mounting hole on the body of the gas strut needs to be enlarged to 1/4" and the mounting hole on end of the strut’s rod gets enlarged out to a whopping 3/8".

I decided to go ahead and drill both ends of each strut with the 1/4" drill bit first, then final drill the 3/8” mounting holes on strut’s rod.
Using the drill press to enlarge the mounting hole on the body of one of the gas struts to 1/4".
Enlarging the mounting hole on the rod end of the strut to 3/8".
Completed drilling of both ends of the C-1216 gas struts.

Another task to perform on the canopy frame was to match drill to #30 the ten holes in the canopy frame. Some of these holes caused an interference problem with the chuck of the drill, so a 12" drill bit was used. After all 10 holes were drilled and deburred, LP4-3 rivets were placed into the holes. For deburring, a wooden dowel rod was used to scrape the burrs off the inside of the square tubing. If a burr bent and went inside the rivet hole, a rivet was used to push the burr back down to get scrapped away by the wooden dowel rod.
Using a 12" drill bit to drill the canopy frame.
Using the hand rivet puller to set an LP4-3 rivet into one of the newly drilled rivet holes in the canopy frame.

After finishing up placing all ten rivets into the canopy frame, decided to call it quits for the day.