Match drilling the aft tab on the F-1248-L armrest.
Riveting the F-1248-R armrest onto the F-1204C-R
forward bulkhead side. Clearance was tight so used the offset tool to gain access for the close quarter hand rivet puller.Before placing the longerons in position for match drilling, the flanges on the F-1201B firewall shelf that will be riveted to the side skins were dimpled for the 120 degree flush rivets that are being used in place of the LP4-3 rivets.
Using the pneumatic squeezer to place 120 degree dimples on the F-1201B firewall shelf’s flanges for the flush rivets being used on the RV-12 project.